Case Study · Main construction sector
Nationwide resource planning at WALO
How Walo Bertschinger AG replaced its complex Excel-based planning system, coordinated staff and stock across several profit centres, and established a unified Switzerland-wide resource planning system.
Short answer
What has WALO achieved with Visual Planning?
Walo Bertschinger AG introduced Visual Planning® as a unified solution for the planning of staff and stock. At the time of the case study, the planning process covered seven profit centres with around 1,000 employees, as well as a stock of materials numbering in the five-figure range. Centralised planning improved transparency and reduced reliance on individual planning managers.
01
Background: Complex Excel files made joint planning difficult
Before the introduction of Visual Planning®, WALO managed staff and stock in highly complex Excel files. The volume of data from separate profit centres grew significantly each year. The original source does not specify any verifiable counting or measurement method for this; the term ‘millions’ is therefore not used as a precise measurement value.
The Excel-based planning was managed by just one or two people. As the company grew, this increased the risk that the absence of key planning personnel or disparate siloed solutions across the sites would disrupt planning.
02
Objective: Joint planning across Switzerland
WALO wanted to replace the Excel files and consolidate the previously separate planning processes of the profit centres. The aim was to create a comprehensive, Switzerland-wide planning system and to support the ‘one company’ philosophy across the organisation in resource planning.
A solution was required that remained flexible despite the complex requirements. Of particular importance were various filters and views for long-term, medium-term, short-term and customer-specific planning.
03
Choice: Flexibility was the deciding factor
WALO was introduced to Visual Planning® via the Baubit-PRO provider ABBF. Following the presentation by Advanced Solutions, a project team comprising four selected profit centres and the project management team compared the requirements profile with the software’s scope of functionality.
The proposal developed on this basis was presented to management. According to the case study, the decisive factor in the decision was, above all, the high flexibility of the solution.
“In our opinion, the software is of a very high standard.”
04
Implementation: Ten-month pilot project
WALO assessed the requirements as part of a ten-month pilot project. Around 15 people were involved in this process. These included representatives from the profit centres across the various departments as well as the project management team.
Following the completion of the pilot project, Visual Planning® was gradually rolled out across the WALO Group. The consultancy, project management and support provided by Advanced Solutions were rated positively in the case study.
05
Application: Joint scheduling of staff and stock
Visual Planning® was used at WALO by scheduling managers at several sites. The departments involved included the maintenance depot and inventory, track construction and road construction.
The planning process covered seven profit centres with around 1,000 employees and a stock of materials numbering in the five figures. Using the filters, users were able to selectively show or hide the information they required without losing the underlying individual data.
06
Benefits: Greater transparency and less dependency
Resource planning was no longer dependent on individual central planners. Several staff members were able to complement one another’s work, stand in for one another and ensure everyone was on the same page.
The analyses also ensured greater transparency. In track construction, working hours could be examined more closely and optimised in line with statutory requirements.
When planning stock levels, WALO was aware of the availability of machinery and lorries within the group of companies. According to the case study, this meant that fewer external hire arrangements were required.
Verifiable results
Benefits at a glance
WALO reported a general increase in planning efficiency, but did not publish any detailed quantitative performance indicators. In particular, the following benefits have been documented: greater transparency, the distribution of planning tasks amongst several people and a reduced need for external contractors.
Source reference
Transparency regarding the information provided
The content is based on the WALO case study published by Advanced Solutions GmbH. The interviewee was Philipp Ledermann, project manager at Walo Bertschinger AG. The interview dates from August 2018. The information regarding the company, the scope of the planning and the results reflects the situation at that time.
The original source states that the WALO Group has around 2,500 employees, subject to seasonal fluctuations . At the time of the survey, the Enterprise version of Visual Planning® had been in use since 2017.
View original source as a PDFTest block
Verifiability of the case study
Period
A ten-month pilot project, in use since 2017, and a customer interview from August 2018. The results reflect the situation at that time.
Product version and modules
The Enterprise version is documented. Specific licensed modules are not mentioned in the original source and are therefore not included in the translation.
Areas of application
Staff and inventory planning for maintenance depots and stock, track construction and road construction across multiple profit centres.
Methodological basis
An editorial summary of the published case study and the interview with Philipp Ledermann featured therein. No independent impact assessment or audit is available.
Result limits
The results consist predominantly of qualitative customer testimonials. Detailed quantitative performance metrics have not been published. The very large volume of data described in general terms in the original source is not used as a precise measurement.
Original source
Approval status
An original case study has been published. There is no record on the website of a separate, recent client approval for this editorially revised web version.
Your planning. Your processes.
Would you like to plan staff and stock centrally?
In a personalised online demonstration, you will see how staff, machines, vehicles, materials and projects can be coordinated on a single planning board.
Request a personal demoRelevant planning topics
The documented implementation at WALO combines Construction site planning, Staff deployment planning and the integrated management of staff and stock. Further operational functions can be found under Resource planning software.