Visual Planning® / Operational resource planning

Resource planning software

Plan employees, machines, vehicles and jobs on a shared digital planning board. Visual Planning® connects appointments, availability and resource assignments for your day-to-day scheduling.

How does resource planning with software work?

An installation job needs a qualified team, a machine and a vehicle on Tuesday. An available team alone is not enough: all required resources must be suitable for the assignment.

01 / Requirements and availability

Prepare the job

Record the time period, required resources and requirements. Check calendars, absences, maintenance windows and existing bookings.

02 / Assignment and checks

Schedule suitable resources

Assign the team, machine and vehicle to the job. Configured rules can highlight overlaps or unavailable resources.

03 / Changes and coordination

Reschedule when resources become unavailable

Check another time slot or alternative resources. Update the plan and provide authorised users with the views suited to them.

In this example, the machine has a maintenance window and the vehicle has another job. The scheduler decides on alternatives; this example does not promise automatic optimisation.

Documented customer example

WALO: Plan staff and equipment together

The interview from August 2018 describes how WALO plans personnel and inventory and improves visibility of machines and trucks. It illustrates a specific application involving several resource types.

Read the WALO case study →

What is needed for implementation?

Resource planning software becomes useful through suitable data and workflows. Before configuration, we clarify who schedules work, which resources belong together and what information comes from existing systems.

Checkpoints for choosing software and your demo
AreaPreparationCheck in the demo
Resources and calendarsEmployees, machines, vehicles, working hours and absencesCan actual availability be clearly understood?
Jobs and rulesTime periods, required qualifications, assignments and conflict rulesDoes a typical bottleneck become visible, and can the assignment be rescheduled?
CollaborationScheduling responsibilities and viewing and editing permissionsDoes each role receive appropriate views, for example through VPPortal?
Existing systemsData source, transfer direction and update intervalWhich interface is already available, and which needs to be configured?

What costs and effort are involved?

The scope depends on the number of users and access options, deployment, modules, configuration, data migration, interfaces and training. A reliable estimate requires an understanding of your planning process; this does not support a general promise of implementation in just a few days.

When is Excel, a rostering tool or ERP/production planning sufficient?

If your existing solution already reliably connects resources, availability and changes, it may be sufficient. Visual Planning® is particularly worth assessing when shared, configurable scheduling across several resource types is missing.

The software does not replace maintained master data or professional approval. The project defines which warnings, reports and interfaces are available. Our Decision-making guide for resource planning supports the comparison. Workforce needs are explored further in Staff deployment planning.

Operational resource planning with Visual Planning®

In day-to-day operations, available resources must be allocated to specific orders, projects, tasks, shifts and deadlines. Visual Planning® brings together the planning information required for this in configurable views.

We explain the general definition, objectives and technical principles in the Glossary of resource planning terms. This page focuses on the operational planning functions.

Typical operational tasks include:

  • determine the availability of staff, machinery and other resources,
  • Select resources based on qualifications and requirements,
  • Allocate orders, projects, tasks and deadlines,
  • Take into account absences, maintenance and restricted periods,
  • Identify overlaps and capacity shortfalls,
  • Adjust priorities and allocations at short notice.

The checks, views and warnings available depend on the data maintained and the specific configuration.

Digital resource planning with Visual Planning

Learn about operational resource planning

We’ll show you how your resources, orders and appointments can be coordinated within a specific operational workflow.

Check availability and bookings

Visual Planning® displays scheduled assignments, free time slots and absences in the calendar and planning views configured for this purpose.

  • Show available and booked time slots
  • Take into account holidays, sickness, maintenance and restricted periods
  • Understand existing mappings
  • Analyse capacity utilisation by time period, team or resource
  • Provide updates centrally to authorised users

Matching resources and requirements

Orders and tasks may include requirements such as time period, qualifications, location, equipment or required capacity. Resources can be filtered, grouped and allocated according to these criteria.

Configured rules can flag missing availability, overlaps or unsuitable assignments.

The software supports the review process. Prioritisation and approval remain technical decisions to be made by the relevant planning managers.

Distinction from strategic resource planning

Strategic resource planning takes into account long-term requirements, capacities and skills. For example, it determines which resources need to be developed for future projects or business objectives.

The Visual Planning application described here comes into play later: during the specific operational allocation within the ongoing planning process.

Operational planning in day-to-day business

Staff, machinery, vehicles and other resources are allocated to orders, projects, tasks, shifts or appointments.

In the event of absences, rescheduled appointments or new priorities, authorised users can adjust assignments and time periods directly.

Planning rules can flag double bookings, insufficient capacity, unsuitable qualifications or blocked time periods.

Functions for operational resource planning

The following functions are configured in Visual Planning® in accordance with business processes, data and planning rules.

Resource Overview

Staff, machinery, vehicles and other resources are displayed in centralised views.

Availability

Assignments, absences, maintenance and closure periods can be taken into account during planning.

Task planning

Resources can be allocated to tasks, projects, orders, shifts and time periods.

Capacity planning

Allocated and available capacity can be displayed for individual resources, teams or resource pools.

Qualifications

Qualifications, authorisations and equipment can be taken into account depending on the configuration.

Flexible rescheduling

Tasks and resource allocations can be centrally adjusted in the event of changes.

Warnings

Planning rules can flag double bookings, overlaps or capacity shortages.

User rights

Visibility and editing options can be restricted in line with the users’ tasks.

Reports

Capacity utilisation, assignments and other planning data can be analysed in customised reports.

Planning views by task and role

The same planning data can be presented from different perspectives. Depending on the task at hand, the focus may be on projects, staff, machines, vehicles, orders or time periods.

Filters, groupings, colours, statuses and visible fields are configured in line with the operational process.

  • Planners can view detailed allocations, conflicts and available time slots.
  • Team leaders receive overviews of tasks, status and workload.
  • Staff can view approved assignments and appointments.
  • Managers can use summarised capacity and status views.
  • User rights restrict visibility and editing capabilities.
  • Changes can be traced back to a shared data source.

Which information is actually assigned to a role is defined in the authorisation and view concept.

For more detailed information on staff planning, please read on at Staff scheduling with Visual Planning®.

Resource and staff deployment planning in Visual Planning
Overview of resource and staff deployment planning

Co-ordinating different resources together

Visual Planning® is not limited to a single type of resource .

Depending on the use case, the following resources, amongst others, can be scheduled:

  • Staff and Teams
  • Machinery and plant
  • Vehicles and trailers
  • Tools and equipment
  • Rooms and workstations
  • Materials and equipment
  • external service providers
  • Project and pool resources

Resource types, attributes and views are configured in accordance with the company’s requirements.

Provide targeted planning information

Depending on the licence, client and system environment, authorised planning information can be made available via desktop, browser or suitable mobile devices.

User rights determine which assignments, tasks, projects and resources a user is permitted to view or edit.

Feedback and status changes can only be recorded if the relevant process and the required fields have been configured.

Full offline operation with subsequent automatic synchronisation cannot be assumed as a general rule.

Try out operational planning in a demo

Using your resources and planning rules as a basis, we will show you how Visual Planning® can map out a specific operational process.

Linking operational planning areas

Visual Planning® can map operational allocations from various planning areas onto a common data foundation.

Integrate with existing systems

Resource, project, order and staff data can be imported from existing applications depending on the specific project.

Planning information and feedback can also be transferred to other systems, provided that suitable interfaces are available.

The nature, direction and update frequency of the data exchange are defined during the requirements and interface analysis .

Visual Planning® can thus enhance existing systems with flexible, graphical views of resources, capacity and scheduling .

Requirements and limitations

Availability, capacity and alerts are only as reliable as the underlying calendars, master data and planning rules.

Qualifications, machine capabilities, absences and interface data must be maintained or transferred in full and kept up to date.

Visual Planning® can highlight conflicts and support alternative planning options. However, the software does not prioritise orders or resources without predefined rules, and does not replace professional approval.

The functions available in each specific case depend on the licence, configuration, user rights and connected systems.

Role-based view of operational resource planning

Further information on selecting software

This page describes the operational use of Visual Planning®. If you would first like to compare Excel, ERP/PPS and specialised planning software in general, please use our Decision-making guide for resource planning.

Questions regarding operational functions

Can Visual Planning® detect double bookings?

Configured rules can flag time overlaps, lack of availability or capacities that are already booked. Which conflicts are checked depends on the data model and the rules that have been set up.

What data is required for operational resource planning?

At a minimum, resources, calendars or availability, and the jobs, tasks or appointments to be scheduled are required. Qualifications, locations, capacities and other requirements can also be taken into account.

How are last-minute changes implemented?

Authorised users can amend time periods, priorities and resource allocations in the views provided for this purpose. The input options available depend on the configuration.

Can qualifications and machine capabilities be verified?

Qualifications, authorisations, equipment or machine capabilities can be stored as attributes and used for filters, assignments and alerts.

Does Visual Planning® automatically calculate available capacity?

Available and booked capacity can be calculated and displayed once working hours, calendars, absences, bookings and the required calculation rules have been fully configured.

How up to date is the planning data displayed?

Changes saved directly in Visual Planning® are available centrally to authorised users. For connected systems, the timeliness of the data depends on the defined data exchange and its frequency.

Operational resource planning with Discover Visual Planning®

We’ll show you how Visual Planning® can map your resources, orders, availability and planning rules within an operational workflow.

Operational resource planning in manufacturing, services and construction

Depending on the area of application, resources are allocated with varying degrees of specificity: The Detailed planning in production links work processes to machines and time slots; the Maintenance and repair planning coordinates plant, technicians and maintenance windows.

Practical examples for various areas of focus are provided by the WALO Case Study for planning staff and stock, which HOMAG Case Study for global technician deployment planning and the GROB Case Study for cross-site resource planning.